Lack of control on construction sites: Where up to 40% of the budget goes missing and how to prevent it

The cost estimate was approved, materials were purchased, and the team began work on the construction site. However, after two months of work it suddenly turns out that the budget funds are almost exhausted, but the work is still ongoing. Some tools cannot be found, and the manager often learns about problems or delays over the phone only after resolving them has become costly.

A construction project seems straightforward and predictable only on paper. Even minor deviations can gradually lead to significant budget overruns. This can be caused by a single poor decision or by a lack of a complete picture of the situation on the construction site or within the company.

Deloitte analysts spent three years analyzing the costs and expenses of more than 30 construction projects and concluded that unjustified expenses and losses occurred during project implementation can amount to 30–40% of the project’s value (important note - that this is an upper limit estimated based on a limited regional sample, not an average figure for the entire market). Nevertheless, the scale of these losses illustrates just how serious the financial consequences of construction management issues can be. With a budget of 500,000 euros, every 10% represents 50,000 euros, and 30–40% amounts to between 150,000 and 200,000 euros.

Where do financial losses come from?

Most often, losses on construction sites occur at various stages of a project. Deloitte analysts identified three main causes: insufficient oversight of the project’s progress, a lack of control over subcontractors, and a lack of proper planning for work and material procurement. All these factors are, in one way or another, related to internal processes within the company, rather than to external factors such as rising material costs or labor shortages.

Alongside these three main causes, there are also a number of other issues that lead to financial losses:

  • changing the project without prior agreement,
  • amendments made on short notice
  • loss of time spent searching for the necessary equipment
  • inefficient division of labor, and downtime for employees and machines,
  • losing information in chats, spreadsheets, or during verbal discussions.

Where exactly is the money being lost?

Most often, financial losses are not the result of a single major mistake, but rather the sum of minor oversights at various stages of the work.

Tools without records

A drill is sent to a nearby construction site “for just one day” and never comes back. The crew waits for someone to find the tool they need, while the company buys a new one in the meantime. Without a record of equipment movements, it’s difficult to determine where it is, what condition it’s in, and when it needs to be sent in for repair. As a result, unnecessary purchases and downtime occur. The solution to this problem is precise equipment tracking and management.

Materials are ordered based on estimates

Materials are ordered with a “just-in-case” reserve, only the warehouse manager knows the inventory status, some materials are accounted for without the proper notation, and the next shipment arrives late. Shortages, damage, and returns are not recorded. As a result, the errors caused by a lack of oversight and improper management of materials on the construction site affect not only the budget but also the progress of the entire project.

Workers and their qualifications

Who is on the construction site today? Who is authorized to perform specific tasks? Which employees' required certifications or training have expired? When a task is assigned to someone who lacks the necessary skills, it becomes necessary to make corrections. Furthermore, allowing a person without the required certification to operate equipment poses a safety risk and may lead to violations of health and safety regulations on the construction site.

Schedules and tasks

Management only finds out about a delay in a project or task once it has already occurred. There is no single, coherent picture of the situation: which tasks are in progress, who is responsible for them, and what is preventing the next phase from starting. To get up-to-date information, the manager has to call the employees. By the time he or she gathers all the data, some of the information and statuses will already be out of date.

Documentation and briefings

The records are kept in paper form; some entries are added late, and only a particular person can locate the necessary document. When he or she is on vacation or leaves the company, access to information becomes difficult, and in some cases, data may be lost forever. To avoid this, it’s a good idea to implement digital online document management.

Why is traditional control not enough?

Traditional project management using paper-based documentation is no longer sufficient in today's environment. Manual monitoring may work on a small-scale construction, but as the number of tasks, subcontractors, and worksites increases, it becomes increasingly difficult to keep track of everything.

Traditional methods of construction project management have their limitations:

  • Spreadsheets require manual updating and data verification.
  • Messaging apps make it difficult to find current agreements.
  • Verbal reports do not always reflect the actual situation on the construction site, and the inspection of concealed work is difficult.
  • Information on work progress and costs incurred may be delayed.
  • Using multiple data sources increases the risk of errors and discrepancies.

Why don't spreadsheets and chat apps solve the problem?

Excel is great for calculations. However, managing a construction project requires working with data that changes every day, and which affects the work of many people. Under these circumstances, spreadsheets and messengers prove to be insufficient for four reasons:

  • Data is dispersed – the cost estimate is kept by the construction estimator, task statuses are in the site manager’s chat, and inventory information is in a notebook.
  • Information is recorded after the work is done, rather than at the time it occurs.
  • There is no activity log. It is unclear who retrieved, transferred, or accounted for what, and when it happened.
  • Everything relies on the memory of specific employees, which increases the risk of errors and the loss of important information.

What is digital construction management?

Simply put, it’s a single system in which data is entered in real time—as soon as an event occurs—directly from the construction site via a phone. Tasks, responsible people, materials, tools, and documents are all linked together, so the manager sees not a bunch of individual reports, but a coherent picture of the situation. Digital construction management does not eliminate all risks, but it helps increase process transparency and significantly simplifies planning and management. With a single digital platform, you can identify problems before they turn into serious financial losses, record deviations and their causes, and monitor material consumption and changes in orders.

How work'n'roll can help solving these problems?

work'n'roll is a construction management program, available in the web version and as a mobile app for IOS and Android. It helps streamline the areas where financial losses most often occur.

The work'n'roll system was created for construction companies that want to switch from chaotic and inefficient management to a single, user-friendly system for digital construction management. When information about tasks, deadlines, and responsible employees is centralized in one place, it’s easier for a manager to spot problems and respond quickly where necessary.

work'n'roll helps you to:

  • Plan work and monitor tasks. Create projects and tasks, assign responsible workers, and track deadlines and progress.
  • Handle materials. Track inventory, monitor resource usage, coordinate the distribution of materials among construction sites, and plan purchases.
  • Monitor tools and equipment. Track their location, usage history and transfer between staff members and warehouses.
  • Organize the team’s work. Assign tasks to employees based on their competences and improve communication between employees and management.
  • Store documentation in one place. Ensure that employees have access to the necessary information and keep documents related to the project organized.
  • Prepare cost estimates and monitor expenditure. Create cost estimates, add the necessary items and materials, estimate planned expenditure and compare it with the actual costs of the project.
  • Ensure workplace discipline and safety. Monitor staff engagement, check the quality of work carried out and record health and safety training and briefings in the system.

The efficient construction site management begins with the understanding of what’s happening at every stage of the project. The sooner a company receives up-to-date information on tasks, resources and emerging problems, the better its chances of preventing additional costs, rather than having to deal with their consequences.

What our clients are saying about us?

After implementing the system at the LIENZO company in Poland, a transparent record of materials and tools was established. Company representatives emphasize that, previously, there were cases of materials being used in excess and delays in procurement, whereas now they can plan orders based on the actual needs of the project. They also value the convenience to create cost estimates within the application.

Meanwhile at Adestra, employees highlight the ability to track the progress of work directly on a mobile phone.

These are customer reviews published on the platform’s website. The results of implementation, of course, always depend on how processes are organised within a given company. However, the system helps to make them more transparent and facilitates their management.

Would you like to see how work'n'roll can perform on your construction site, improve resource control and enhance team collaboration? Discover what work'n'roll has to offer. Book a system demo or start using the platform for free at worknroll.pro.

What’s next?

This is the first article in a series on the features of work'n'roll. In future articles, we’ll show you how to prepare a cost estimate and create a project in the system, manage staff, keep track of tools and materials, and use the mobile app.

Frequently asked questions (FAQ)

How can you prevent a construction project from going over budget?

The most efficient way is to implement a comprehensive digital system for tracking materials and tools in real time. Recording the use of resources directly on site enables you to identify excessive expenditure before it affects the final financial result.

Why don't Excel spreadsheets aren’t suitable for construction site management?

Excel requires data to be entered manually, which leads to errors and outdated information. The data is scattered across various files and between different people, meaning that the manager does not have a complete picture of the situation at the site.

How can I quickly identify errors and delays on a building site?

The key is the ongoing flow of information between the construction site and staff and management. Thanks to mobile task logging and real-time status updates, the site manager can immediately spot any downtime or resource issues and respond before they result in additional costs.